TECHNICAL IMPROVEMENTS TO CLUSTER
In summer 2018, some newest generation and more powerful computing nodes were added to the RTU cluster.
In brief
- The cluster’s performance has been increased for more than 100 Tflops.
- A total of 496 CPU cores have been added.
- 2 nodes with 4 × Nvidia Tesla V100 GPUs have been added.
- 1 powerful node with 4 CPU (72-core) and 1.5 TB RAM has been added.
More information on the technical parameters is available here.